Tiessen’s Headwall Construction
Details
Project Value: $1.4 Million
Project Duration: 4 Months
Client: Tiessen’s Farm
Description: Tiessen’s Headwall Construction was a project that aimed to improve the water management capabilities of Tiessen’s Farm. This headwall structure was constructed to help with storm and farm water runoff.
Solutions
Sherway’s comprehensive strategy encompasssed the following:
Excavation: Vehicles were used to excavate an underground area for the sewage piping and headall to be constructed.
Grading: The terrain surrounding the headwall was leaveraged to allow water to run downward.
Stonework: High-quality stone work was done to construct the headwall.
Outcomes
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consectetur adipiscing.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consectetur adipiscing.

