Completed Projects
Tiessen's Headwall Construction
Details
Project Value: $1.4 Million
Project Duration: 4 Months
Client: Tiessen’s Farm
Description: Tiessen’s Headwall Construction was a project that aimed to improve the water management capabilities of Tiessen’s Farm. This headwall structure was constructed to help with storm and farm water runoff.
Solutions
Sherway’s comprehensive strategy encompasssed the following:
Excavation: Vehicles were used to excavate an underground area for the sewage piping and headall to be constructed.
Grading: The terrain surrounding the headwall was leaveraged to allow water to run downward.
Stonework: High-quality stone work was done to construct the headwall.

Dougall Road Rehabilitation
Details
Project Value: $2.8 Million
Project Duration: 6 Months
Client: City of Windsor
Description: The Dougall Avenue rehabilitation was a critical venture aimed at improving a primary urban artery suffering from extensive wear and years of heavy traffic influence.
Solutions
Sherway’s comprehensive strategy encompasssed the following:
Crack Sealing and Surface Treatment: Materials were used to seal cracks, preventing future water intrusion and foundational damage.
Drainage System Overhaul: Problematic drainage areas were identified and modernized to prevent water accumulation.
Resurfacing: High-quality paving techniques ensured a consistent, durable road surface.