Completed Projects

Tiessen's Headwall Construction

Details

Project Value: $1.4 Million

Project Duration: 4 Months

Client: Tiessen’s Farm

Description: Tiessen’s Headwall Construction was a project that aimed to improve the water management capabilities of Tiessen’s Farm. This headwall structure was constructed to help with storm and farm water runoff.

Solutions

Sherway’s comprehensive strategy encompasssed the following:

Excavation: Vehicles were used to excavate an underground area for the sewage piping and headall to be constructed.

Grading: The terrain surrounding the headwall was leaveraged to allow water to run downward.

Stonework: High-quality stone work was done to construct the headwall.

Sherway contracting services- construction equipment at a worksite

Dougall Road Rehabilitation

Details

Project Value: $2.8 Million

Project Duration: 6 Months

Client: City of Windsor

Description: The Dougall Avenue rehabilitation was a critical venture aimed at improving a primary urban artery suffering from extensive wear and years of heavy traffic influence.

Solutions

Sherway’s comprehensive strategy encompasssed the following:

Crack Sealing and Surface Treatment: Materials were used to seal cracks, preventing future water intrusion and foundational damage.

Drainage System Overhaul: Problematic drainage areas were identified and modernized to prevent water accumulation.

Resurfacing: High-quality  paving techniques ensured a consistent, durable road surface.

road called dougall avenue with the road repaved